|
|
Table Of Contents
|
| Subject | Revision | Date |
|
General Information |
- | - |
|
1-1 Introduction |
1 | 04-01-2002 |
| Components | - | - |
| 2-1 Cylinders & Valves | 1 | 04-01-2002 |
| Valve Rebuilding Equipment | - | - |
| Wet Valve Seal Rebuilding Kit | - | - |
| 2-2 Pressure Regulatory Assembly | - | - |
| Pressure Regulator Rebuilding Kit | - | - |
| Model VT-1 Tool | - | - |
| Cylinder Bracketing | - | - |
| Extinguishing Agent | - | - |
| 2-3 MCH3 Control Head | - | - |
| ECH3 Control Head | - | - |
| NMCH3 Control Head | - | - |
| EN-MCU3 Enclosure | - | - |
| EN-S Enclosure | - | - |
| 2-4 MB-P2 Mounting Bracket | - | - |
| Pneumatic Actuating Cylinder | - | - |
| PAC - 10 | - | - |
| 2-5 Detection Equipment | 1 | 04-01-2002 |
| FLK - 1 | - | - |
| FLH - 1 | - | - |
| 2-6 Fusible Links | 1 | 04-01-2002 |
| Thermal Detectors | - | - |
| RPS-M Remote Pull Station | - | - |
| Gas Shut Off Valves | - | - |
| GV Shut Off Valves | - | - |
| 2-7 EGVSO Gas Shut Off Valves | 1 | 04-01-2002 |
| Corner Pulleys | - | - |
| SBP-1 Corner Pulleys | - | - |
| CBP-1 Corner Pulleys | - | - |
| WBP-1 Corner Pulleys | - | - |
| 2-8 Tee Pulley | 1 | 04-01-2002 |
| Electric Switches | - | - |
| 2-9 SM-120/24 Solenoid Monitor | - | - |
| Pipe and Fittings | - | - |
| Nozzles | - | - |
| Swivel Adaptor | - | - |
| 2-10 Components List | 1 | 04-01-2002 |
|
System Design |
- | - |
| 3-1 Nozzle Coverage and Placement | 1 | 04-01-2002 |
| Duct Protection | - | - |
| Transition Ducts | - | - |
| 3-2 Electrostatic Precipitator | 1 | 04-01-2002 |
| Plenum Protection | - | - |
| 3-3 Appliance Protection | 1 | 04-01-2002 |
| Design Chart | - | - |
| Fryers | - | - |
| 3-4 Range (Small) | 1 | 04-01-2002 |
| 3-5 Range (Large) | 1 | 04-01-2002 |
| 3-6 Small Work | 1 | 04-01-2002 |
| 3-7 Large Work | - | - |
| Small Griddle | 1 | 04-01-2002 |
| 3-8 Large Griddle | - | - |
| Radient Char Broiler | 1 | 04-01-2002 |
| 3-9 Radient Char Broiler | 1 | 04-01-2002 |
| Lava Rock Char-Broiler | - | - |
| Natural Charcoal Char-Broiler | - | - |
| 3-10 Mesquite Char-Broiler | 1 | 04-01-2002 |
| Upright/Salamander Broiler | - | - |
| 3-11 Chain Broiler | 1 | 04-01-2002 |
| Tilt Skillet/Braising Pan | - | - |
| 3-12 Fryer - Multiple Nozzle Protection | 1 | 04-01-2002 |
| Piping Limitations | - | - |
| 3-13 General Piping Requirements | 1 | 04-01-2002 |
| Design Steps | - | - |
| 3-14 Design Steps (cont.) | 1 | 04-01-2002 |
| 3-15 Design Steps (cont.) | 1 | 04-01-2002 |
| 3-16 Design Steps (cont.) | 1 | 04-01-2002 |
| 3-17 Detector Placement | New | 04-01-2002 |
| Exhaust Duct(s) | - | - |
| Cooking Appliance(s) | - | - |
| 3-18 Notes | New | 04-01-2002 |
|
System Installation |
- | - |
| 4-1 General | 1 | 04-01-2002 |
| Cylinder Installation | - | - |
| Control Head Installation | - | - |
| Single Cylinder Introduction | - | - |
| 4-2 Multiple Cylinder Installation | 1 | 04-01-2002 |
| 4-3 Multiple Cylinder Installation (cont.) | 1 | 04-01-2002 |
| 4-4 Fusible Link Detector Installation | 1 | 04-01-2002 |
| Fusible Links Without Hangers | - | - |
| 4-5 Fusible Links With Link Hangers | 1 | 04-01-2002 |
| 4-6 Thermal Detector Installation | 1 | 04-01-2002 |
| Setting The Control Head | - | - |
| MCH3/NMCH3 Control Head | - | - |
| ECH3 Control Head | - | - |
| 4-7 Solenoid Monitor Installation In A Detection Circuit | 1 | 04-01-2002 |
| 4-8 Solenoid Monitor When Used As A Reset Relay | 1 | 04-01-2002 |
| Remote Pull Station Installation | - | - |
| 4-9 Remote Pull Station Installation (cont.) | 1 | 04-01-2002 |
| 4-10 Gas Shut Off Valve Installation | 1 | 04-01-2002 |
| Mechanical Gas Shut Off Valve Installation | - | - |
| Electrical Gas Shut Off Valve Installation | - | - |
| 4-11 Tee Pulley Installation | 1 | 04-01-2002 |
| Miniature Switch Installation | - | - |
| 4-12 Pipe And Nozzle Installation | 1 | 04-01-2002 |
| System Checkout after Installation | - | - |
| Model MCH3/NMCH3 | - | - |
| Mechanical Control Head | - | - |
| 4-13 Model ECH3-24/120 | - | - |
| Electrical Control Head | - | - |
| 4-14 Enclosure Mounting | 1 | 04-01-2002 |
| Fusible Link Detector Installation | - | - |
| 4-15 Setting the EN-MCU3 Remote Pull Station Installation | 1 | 04-01-02 |
| 4-16 Gas Shut-Off Valve Installation | 1 | 04-01-2002 |
| 4-17 Miniature Switch Installation | - | - |
| 4-18 Cylinder Installation | 1 | 04-01-2002 |
| Single Cylinder Installation | - | - |
| Multiple Cylinder Installation | - | - |
| 4-19 System Checkout After Installation | - | - |
| 4-20 Notes | - | - |
|
System Maintenance |
- | - |
| 5-1 General | 1 | 04-01-2002 |
| Semi-Annual Maintenance | - | - |
| Annual Maintenance | - | - |
| 12-Year Maintenance | - | - |
| 5-2 Notes | - | - |
|
System Recharge |
- | - |
| 6-1 General | 1 | 04-01-2002 |
| System Cleanup | - | - |
| System Recharge | - | - |
| 6-2 System Recharge (cont.) | 1 | 04-01-2002 |
| ||||